NEWPRO uPVC Bends and Collars

Bend 30°

Bend 45°

Bend 90°

Collar
DIA | Wall Thickness | Bend 30° | Bend 45° | Bend 90° | Collar |
55 mm | 2.2 mm | ||||
82 mm | 2.2 mm | ||||
110 mm | 2.4 mm | ||||
160 mm | 2.6 mm | ||||
160 mm | 3.6 mm | ||||
56.5 mm | 3.25 mm | ||||
96.5 mm | 3.25 mm |
Technical Specifications and installation instructions
NEWPRO Conduit and trunkings are light weight, user friendly, easy to handle and does
not call for on-site handling equipment due to its versatile design and features. NEWPRO cable management products are non- conductive, non-corrosive, complies with relevant specifications, codes of practice and regulations for Electrical Equipment Buildings (IEE publication).
Installation should be undertaken by proficient personnel with due for safety and environment interests to achieve optimum benefits of cable management. Following instructions are intended to be a guide for the installation of NEWPRO products.
Conduit Systems
Choice of Conduits and Installation
| Joint and Couplers
|
The choice of conduit and fittings is subject to kind of work being executed and the specifications required. |
|
Method of Bending
| Cable Carrying Capacity
|
All NEWPRO conduits of different gauges under 25mm OD size can be easily bent cold by using designated bending spring. Ensure using of correct size and gauge. Insert the spring into desired position, grip the conduit on either sides and exert force by hand. or place the conduit across the knee and continue bending slowly but progressively until bend is slightly beyond the angle required. Now, allow the conduit to recover back to the desired position. To remove the spring from conduit, twist it in anti-clockwise direction while rotating the conduit clockwise simultaneously pulling them slowly apart. Bending of conduits above 25mm size shall be carried out with hot bending technique. Insert proper size of spring into the conduit as explained above and immerse bending portion in boiling water or use a radiant heat source. When the conduit softens, used a suitable former and continue holding until bend is set to required angle.
| Size of the conduit is explicitly governed by IEE publication to ensure accommodating maximum number of cables of the same size, or different sizes for complying with the requirement of regulations. This is necessitated to make certain the number of cables drawn into conduit or a wiring system shall be such that no damages caused to the cables and conduits while carrying out the installation |